Public Works Officer

Public Works Officer performs routine checks, treatments, and follow-ups across 20 concise tasks designed for clarity. These show who’s affected, what the main action is, and a quick safety reminder. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
9tools of the trade
47-4011.00O*NET-SOC code
146,720hold this job (US, BLS 2025)
$74,690median pay/yr (US)
Open Public Works Officer in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Construction and Building Inspectors in the U.S. earn more than $74,690 a year — the middle 80% land between $47,140 and $114,200. About 146,720 people in the U.S. do this work. Figures are for the U.S. occupation group “Construction and Building Inspectors”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$74,690typical pay / year
146,720people in this work
$114,200+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Protecting4

Inspect structures for compliance with codes

+
Inspect the east bridge support and adjacent retaining wall today, record any code nonconformance with photos…
Inspect the east bridge support and adjacent retaining wall today, record any code nonconformance with photos and measurements, flag structural cracks over 10 millimetres, and prepare a signed inspection report for the city building file before 1700.
The tools that do the workArc Second PocketCADESCOjob descriptionsO*NETWikipedia

Review building plans for approval

+
Review the submitted three-storey mixed-use plans for 142 River Road, verify egress routes, fire-resistance…
Review the submitted three-storey mixed-use plans for 142 River Road, verify egress routes, fire-resistance ratings, and load-bearing member sizes against code, list required changes with referenced code sections, and return the marked-up plan to the applicant by Wednesday.
The tools that do the workAutodesk AutoCADjob descriptionsO*NETWikipedia

Monitor construction sites for safety and standards

+
Conduct a safety sweep of the North Avenue construction site, verify perimeter controls, scaffold ties, and…
Conduct a safety sweep of the North Avenue construction site, verify perimeter controls, scaffold ties, and PPE use, document any breaches with photos, issue corrective action requests to the contractor, and escalate unresolved hazards to the project manager.
The tools that do the workMicrosoft Wordjob descriptionsO*NETWikipedia

Issue violation notices and stop-work orders

+
Issue a formal violation notice for uncovered excavation at 88 Elm Street: describe the breach, cite the code…
Issue a formal violation notice for uncovered excavation at 88 Elm Street: describe the breach, cite the code sections, require cessation of work until shoring and erosion controls are installed, set a 48-hour remediation deadline, and send to the contractor and permitting office.
The tools that do the workAutomated permit systemjob descriptionsWikipedia
Keeping the record1

Keep daily logs and digital images

+
Compile today’s site daily log for Pier 7: attach time-stamped digital photos of dive operations and hull…
Compile today’s site daily log for Pier 7: attach time-stamped digital photos of dive operations and hull repairs, note dive team safety checks, weather, and equipment issues, then upload the entry to the project record and notify the project engineer.
The tools that do the workMicrosoft ExcelMicrosoft Officejob descriptionsO*NETWikipedia
Care1

Ensure safety protocols are followed on-site

+
Verify that dive-team lockout procedures and breathing-gas checks were completed on the morning shift,…
Verify that dive-team lockout procedures and breathing-gas checks were completed on the morning shift, confirm all personnel logged required PPE and emergency briefings, note any deviations, and file a compliance memo to the health and safety officer before the shift change.
The tools that do the workSAPjob descriptionsWikipedia
The daily work14

Ensure health and safety of dive teams

+
Confirm the dive schedule, inspect the tender and breathing-air logs, verify medical clearance and emergency…
Confirm the dive schedule, inspect the tender and breathing-air logs, verify medical clearance and emergency kit contents, brief the dive team and contractor on hazards, and issue a stop-work order if any equipment or fitness-for-dive item is non-compliant before launch.
The tools that do the workMicrosoft WordMicrosoft OutlookESCOsee the evidence ↗

React to events in time-critical environments

+
When an incident report or sudden weather change arrives, gather real-time vessel and diver status, reassign…
When an incident report or sudden weather change arrives, gather real-time vessel and diver status, reassign surface support, trigger the emergency response checklist, notify the incident commander and adjust dive windows or halt operations with clear written orders.
The tools that do the workMicrosoft OutlookMicrosoft ProjectESCOsee the evidence ↗

Issue permits for construction, relocation, demolition, or occupancy.

+
Issue a construction, relocation, demolition, or occupancy permit for 42 Harbor Drive: verify the submitted…
Issue a construction, relocation, demolition, or occupancy permit for 42 Harbor Drive: verify the submitted site plan and safety plan, confirm contractor insurance and dive‑work mitigation measures, then post the signed permit and notify the contractor by Friday.
The tools that do the workAutomated permit systemO*NET

Confer with owners, violators, or authorities to explain regulations or recommend remedial actions.

+
Meet with the owner of Pier 7 and the building inspector to explain the seawall repair regulations, recommend…
Meet with the owner of Pier 7 and the building inspector to explain the seawall repair regulations, recommend immediate shoring and a revised dive safety plan, record agreed corrective actions, and set a compliance review in two weeks.
The tools that do the workMicrosoft WordMicrosoft OutlookO*NET

Estimate cost of completed work or of needed renovations or upgrades.

+
Estimate the cost to replace the damaged dock lighting and upgrade power to code: list labor, materials, dive…
Estimate the cost to replace the damaged dock lighting and upgrade power to code: list labor, materials, dive support hours, contingency, and permit fees, produce a one‑page cost summary for the finance director by Wednesday.
The tools that do the workMicrosoft ExcelO*NET

Evaluate premises for cleanliness, such as proper garbage disposal or lack of vermin infestation.

+
Inspect 118 Marina Way for cleanliness: document garbage accumulation, evidence of vermin, and blocked…
Inspect 118 Marina Way for cleanliness: document garbage accumulation, evidence of vermin, and blocked drains, take time‑stamped photos, issue a corrective notice to the owner with a 10‑day abatement deadline and a reinspection date.
The tools that do the workMicrosoft OfficeO*NET

Sample and test air to identify gasses, such as bromine, ozone, or sulfur dioxide, or particulates, such as mold, dust, or allergens.

+
Collect and analyze air samples at Pump Station B to check for bromine, ozone, sulfur dioxide, and…
Collect and analyze air samples at Pump Station B to check for bromine, ozone, sulfur dioxide, and particulates, log instrument readings and sample chain of custody, then file the lab report and safety recommendation within 48 hours.
The tools that do the workMicrosoft WordMicrosoft ExcelO*NET

Respond immediately to site accidents or issues

+
Respond to the collapsed scaffolding at 27 Pier Road: secure the scene, suspend all diving operations,…
Respond to the collapsed scaffolding at 27 Pier Road: secure the scene, suspend all diving operations, coordinate emergency services and the contractor, document injuries and damage, and file an incident report and immediate stop‑work order.
The tools that do the workMicrosoft OutlookMicrosoft Wordjob descriptions

Use survey equipment to verify measurements

+
Verify the underwater survey by re-measuring the pier piles and seabed control points with the total station…
Verify the underwater survey by re-measuring the pier piles and seabed control points with the total station and hand-held depth gauge, record final coordinates and depths against the survey sheet, and flag any discrepancies over 25 millimetres.
The tools that do the workArc Second PocketCADjob descriptions

Make sure divers adhere to safety regulations

+
Run the pre-dive safety brief, confirm each diver has their medical clearance, pre-dive checklist signed,…
Run the pre-dive safety brief, confirm each diver has their medical clearance, pre-dive checklist signed, redundant air and comms fitted, and log explicit acceptance or withhold permission if any critical item is missing before the job start.
The tools that do the workMicrosoft WordMicrosoft OutlookESCO

Diving vessels systems

+
Inspect the dive support vessel systems today: test the bellows winch, verify emergency gas supply pressure,…
Inspect the dive support vessel systems today: test the bellows winch, verify emergency gas supply pressure, run comms and hot-water loop checks, record faults in the vessel log and tag out any system failing safety tolerances.
The tools that do the workMicrosoft ExcelESCOsee the evidence ↗

Implement dive plans

+
Execute the dive plan by confirming task times, assigning diver pairs and bottom times, publishing the…
Execute the dive plan by confirming task times, assigning diver pairs and bottom times, publishing the surface tender duties, and upload the signed plan and contingency steps to the site control folder before first bell.
The tools that do the workMicrosoft OfficeMicrosoft OutlookESCOsee the evidence ↗

Interrupt diving operations when necessary

+
Immediately stop diving operations if visibility drops below planned minimum, if comms fail, or if a diver…
Immediately stop diving operations if visibility drops below planned minimum, if comms fail, or if a diver reports symptoms; order the team up, start emergency ascent protocols, and file an incident report within the shift log.
The tools that do the workMicrosoft WordMicrosoft OutlookESCOsee the evidence ↗

Work in a construction team

+
Coordinate with the construction foreman to slot the dive window into the civil sequence, confirm lift and…
Coordinate with the construction foreman to slot the dive window into the civil sequence, confirm lift and plant timings, record shared safety zones and exclusion times, and circulate the agreed daily plan to crews before first light.
The tools that do the workMicrosoft ProjectMicrosoft OutlookESCOsee the evidence ↗

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses